A client calls, you visit the job, and by the evening they are waiting for a number. That is often where the job is won or lost. Whether you call it writing a quote, making a quote or writing up a quote for a job, the goal is the same: a clear, detailed quote that reassures the client and protects your margin. Here is the method I recommend to go from a site visit to a signed quote, step by step, with a worked example at the end.
How do you write a quote for a job? The short answer
If you only have two minutes, here are the seven steps:
- 1Visit the job and note measurements, existing condition, access and the client's expectations.
- 2Break the work into lines, grouped by area or by stage.
- 3Price each line: quantity, unit, unit price, and tax where your country applies one.
- 4Keep labour and materials apart, so the client can compare and you can adjust.
- 5Add the terms: validity date, start date, duration, deposit and payment schedule.
- 6Send it the same day, as a PDF with a short recap message.
- 7Get it signed: the signature turns the quote into an agreement.
The rest of this guide explains each step and the mistakes that cost jobs.
What should you note during the site visit?
The quote begins on site, not at your desk. While you are there, write down everything that will affect the price:
- measurements: areas, lengths, number of units or fittings;
- the existing condition: what has to be removed, repaired or protected;
- access constraints: stairs, parking, waste removal;
- the client's expectations: quality of materials, deadlines, rooms that must stay usable.
Take photos. They help you price the job and later explain a line if the client asks. If something is unclear, ask straight away: an assumption you did not check often turns into extra work you never get paid for.
How do you break a job into quote lines?
A good quote reads like a list of work, not a single figure. I suggest grouping lines by area or by stage: preparation, main work, finishing, clean-up. Each group can show its own subtotal, which helps the client see where the money goes.
For each line, include:
- 1a precise description ("Remove existing wall tiles and dispose of waste" rather than "Tiling");
- 2a quantity and a sensible unit: square metre, linear metre, hour, fixed price, item;
- 3a unit price before tax;
- 4the tax rate that applies, where your country uses one.
Detail protects you. If there is a disagreement later, a precise line shows what was included and what was not. For unforeseen work, the safest route is a separate quote, accepted before you start it.
Should labour and materials be on separate lines?
Yes. Separate lines for fitting and for materials make the quote easier to read and to adjust. If the client wants a different tile range, you change one materials line without touching the labour. It also makes your markup on materials easier to manage from one job to the next.
How do you price your time?
Time is the item most often underestimated. Price hours from a rate that covers your running costs, travel and unbillable time such as quoting, admin and buying materials, not from what a competitor seems to charge. Our guide on working out your hourly rate walks through the calculation.
What details make a quote professional?
Beyond the lines, a few pieces of information turn a quote into a reliable working document:
- your full business details and the client's;
- the job address if it differs from the client's address;
- the date of the quote and how long it is valid;
- the expected start date and duration of the work;
- your payment terms: deposit on acceptance, stage payments, balance on completion;
- totals before tax, tax, and the final total.
Presentation matters too: your logo, a quote number, consistent wording and a PDF rather than an editable file. A client comparing three quotes trusts the one that looks organised.
What a quote or an invoice must legally contain depends on your country and your business status, so check the rules that apply to you. Our article on what to put on an invoice is a good checklist for the invoice that follows.
Quote or estimate: which one are you writing?
A quote is a fixed price for a defined job; an estimate is an approximation that may change. Say which one it is on the document. If the scope is uncertain, an estimate is more honest, and you can turn it into a quote once you know more. The difference is explained in quote vs estimate.
How do you ask for a deposit without awkwardness?
A deposit pays for materials and confirms the client's commitment. State it clearly on the quote, as a percentage or an amount, with when it is due. Keep the wording factual: "A 30% deposit is due on acceptance so we can order materials." A short, plain sentence works better than a long justification. More wording ideas are in our guide on asking for a deposit.
What does a finished job quote look like?
Here is a simplified example for a painting job, to show the structure. The business, client and prices are invented for illustration; use your own rates.
| Line | Quantity | Unit | Unit price | Total |
|---|---|---|---|---|
| Preparation | ||||
| Protect floors and furniture, mask edges | 1 | fixed price | 60.00 | 60.00 |
| Fill cracks and sand walls | 42 | m² | 3.00 | 126.00 |
| Painting | ||||
| Labour: two coats on walls | 42 | m² | 9.00 | 378.00 |
| Materials: matt wall paint, 10 L | 2 | item | 55.00 | 110.00 |
| Clean-up | ||||
| Clean-up and waste removal | 1 | fixed price | 40.00 | 40.00 |
| Total before tax | 714.00 |
Under the table: valid for 30 days, work over 3 days starting on an agreed date, 30% deposit on acceptance, balance on completion, signature and date of the client. Tax, if your country applies one, is added line by line according to your local rules.
Notice what the example does: every line says what is done, labour and materials are separate, and the client can check every total.
How do you send a quote and get it signed?
Send the quote soon after the visit, while the project is fresh in the client's mind. A PDF with a short message recalling what you discussed gets read more readily than a bare attachment.
Signature is what turns the quote into an agreement. Online signing shortens the wait: the client accepts from their phone and you are notified straight away.
If you hear nothing after a week, follow up once by message, then by phone. A polite follow-up shows you want the job; it does not come across as pushy. Once the job is done, turning the accepted quote into an invoice takes a few clicks.
Common questions about quoting a job
How do I write up a quote for a job I have never done?
Break it into tasks you do know, price each one, and add a clearly labelled line for anything uncertain. If the scope is really unclear, send an estimate rather than a fixed quote.
Can I make a quote on my phone?
Yes. A quoting tool that works in the browser lets you build the quote on site, right after the visit, and send it before you leave.
How long should a quote be valid?
You set the validity period on the quote. Shorten it when material prices move a lot.
What if unexpected work comes up?
Stop, explain it to the client and get a separate quote accepted before doing the extra work.
Summary: the steps of a winning quote
| Step | What you do | Why it matters |
|---|---|---|
| Site visit | Measurements, photos, constraints, expectations | Accurate pricing, nothing forgotten |
| Breakdown | Lines grouped by area or stage | A quote that is easy to read and discuss |
| Pricing | Quantity, unit, price before tax, tax per line | A total the client can check |
| Labour and materials | Separate lines | Easy to compare and adjust |
| Terms | Validity, dates, deposit, payment | A clear framework for both sides |
| Sending | PDF plus a short recap message, the same day | A faster answer |
| Signature | Signed and dated acceptance | The quote becomes an agreement |