Quotes

The 10 most common mistakes on tradespeople's quotes

Quotes tend to repeat the same mistakes, and they cost jobs or margin. The ten most common, and how to avoid them.

Published 3 min read

A badly built quote costs you twice: it loses jobs, when the client cannot follow it or compares it poorly, and it loses margin, when a forgotten item ends up at your expense. The good news is that the same mistakes come up again and again. Here are the ten most common, and how to catch them before you send.

Key takeaway: check every quote against a checklist, looking at side items (strip-out, waste, travel), terms (validity, deposit, payment) and how clear each line is. Five minutes of checking prevents most losses.

1. Vague lines

"Plumbing works: 2,400". The client does not know what they are paying for, cannot compare, and haggles over the total. Break it down: supply and fitting of each item, quantities, units. Precise lines build trust and avoid arguments at the end.

2. Forgetting side items

Strip-out, waste removal, protecting the property, the final clean: these take time and are often forgotten. They are the first place margin leaks. For a full structure, see our guide to writing a quote.

3. No validity date

Without an expiry date, the client can pull out your quote months later at outdated prices. Give a specific date: see our article on quote validity periods.

4. No deposit

On a materials-heavy job, no deposit means you are financing the work. State the amount, when it is due and that work starts on receipt: see our guide to asking for a deposit.

5. Missing payment terms

Due date, accepted methods, late payment terms: without them, every delay becomes a negotiation. See our article on invoice payment terms.

6. Wrong tax

A wrong tax rate changes the final price the client pays. Check the rate that applies to the kind of work and the client.

7. No caveats about existing conditions

Damp walls, old pipes, rotten timbers: what only shows once work starts should be flagged in the quote. One sentence avoids a dispute. See our article on quote vs estimate for where firm prices end and estimates begin.

8. Forgetting travel

A distant job with no travel line costs unpaid hours on the road. See our article on charging for travel.

9. Arithmetic errors

A quantity copied wrongly, a total that does not match the lines, a discount applied twice. Software does the sums; if you quote by hand, always recheck the total.

10. Sending too late

A quote sent two weeks after the visit arrives after your competitor's. Send it within two or three days, and follow up if you hear nothing: see our article on following up a quote.

Why these mistakes keep happening

Most of these mistakes come from quoting in a hurry, from memory, late in the evening after a day on site. The fix is not more effort but a better system: saved prices for your usual items, standard lines for strip-out and waste, a default validity period and deposit, and totals calculated automatically. Once those are in place, each quote starts complete, and your time goes into the specific details of the job.

Pre-send checklist

CheckYes / No
Detailed lines with quantities and units
Strip-out, waste and clean-up priced
Travel priced or included
Caveats about existing conditions written
Tax rate checked
Validity date stated
Deposit and payment terms stated
Total rechecked
Client details correct
Sent within three days of the visit

Print this list or keep it handy. After a few weeks it becomes second nature.

Fixing a quote already signed

If you find a mistake after signature, do not quietly change the quote: offer the client a revised quote or a change order and have it signed. A signed quote binds both sides to what was signed. If a client later disputes the amount, the steps are in our article on invoice disputes.

Share this article

Frequently asked questions

Should I check every quote?
Yes, with a checklist: five minutes of checking prevents most mistakes.
Can a mistake on a signed quote be fixed?
Only with the client's agreement, through a revised quote or signed change.
Which mistake costs the most?
Leaving out a whole item such as strip-out or waste removal: it is rarely recovered after signing.